@ -483,8 +483,9 @@ And it just makes kinda sense no?
|
||||
|
||||
/* disabled temporarily
|
||||
// theoretical attempt
|
||||
// would need to define the ones not defined or redefine/override existing ones in qcom-ipq4019 to create mfr config
|
||||
// perhaps all encapsulated in edma switch?
|
||||
// would need to define the ones not defined or redefine/override existing ones in qcom-ipq4019.dtsi to recreate mfr config
|
||||
// perhaps all encapsulated in edma switch as mfr does?
|
||||
// also these need to be redefined within SOC and the gmac node from upstream needs to be deleted (with /delete-node/)
|
||||
edma {
|
||||
// GMAC0: WAN1
|
||||
gmac0: ethernet@98000 {
|
||||
@ -498,9 +499,9 @@ edma {
|
||||
|
||||
gmac1 {
|
||||
|
||||
// switch 1
|
||||
// switch 2
|
||||
// or very basic config, and init scripts attach switches to it (switches being defined elsewhere in DTS)
|
||||
// nested switch 1 (QCA8337)
|
||||
// nested switch 2 (QCA8075)
|
||||
// or very basic config, and both switches identify gmac1 as "cpu".
|
||||
|
||||
};
|
||||
|
||||
@ -518,17 +519,28 @@ edma {
|
||||
|
||||
/*
|
||||
|
||||
upstream only has "gmac" but our highly specialized configuration requires 3 gmac.
|
||||
upstream only has "gmac" but our highly specialized hardware configuration from mfr requires gmac0-2.
|
||||
|
||||
I suggest we delete any upstream nodes ("gmac") , and define our own in the SOC block just as the manufacturer has for gmac0 gmac1 and gmac2.
|
||||
I suggest we delete any upstream nodes ("gmac") , and define our own in the SOC block just as the mfr has for gmac0 gmac1 and gmac2. The mfr has also encapsulated this within an edma block.
|
||||
|
||||
As for switches, we defined them, but dont connect - init scripts connect them to gmac1
|
||||
As for switches, don't we define both to use gmac1 as the "cpu" ? That would put them side by side, allowing intercommunication (via the "cpu" aka gmac1 aka eth1) between the switches (two switches, 4 lan each)
|
||||
|
||||
qcom-ipq4019.dtsi stock-fixed.dts (mfr)
|
||||
switch: switch@c000000 -> ess-switch@c000000 (possible override? or redefine in soc?)
|
||||
Then OpenWRT handles the communication between wan1, lan, wan2 based on it's firewall rules, etc. with physical separation between the security concerns as expected for an SMB device.
|
||||
|
||||
qcom-ipq4019.dtsi (upstream) stock-fixed.dts (mfr)
|
||||
switch: switch@c000000 -> ess-switch@c000000 Delete nodes.
|
||||
upstream: switch@c000000 is a switch / mfr: ess-switch@c000000 is a proprietary LED controller
|
||||
ess-switch from mfr is not needed. I believe this is how the mfr connects LED's to their source. It contains led_source@0-4 a total of 5 LED's (pwr,wps,2.4g,5g1,5g2)
|
||||
I believe this is the proprietary LED controller that abstracts and hides gpio information FOR LEDS from the developer attempting to port the device.
|
||||
this combined with lack of GPIO mapping information prevents successful port of devices without advanced/risky technique (probing GPIO and possibly damaging hardware)
|
||||
how juvenile to prevent access to LEDS FFS!
|
||||
|
||||
mdio: mdio@90000 -> mdio@90000 Redefine as per mfr.
|
||||
upstream: 5 phy, switches daisy chained / mfr: 4 ports, not possible to be daisychained...
|
||||
mfr DTS does not indicate whether this is QCA8337 or QCA8075 - it must be one, and the other which is missing must be configured elsewhere (outside DTS?)
|
||||
mfr defines ethernet-phy@0-4 in this block, it must be 4 of 8 LAN ports (one of the two switches)
|
||||
|
||||
I have yet to find the second switch. Perhaps it is configured with init scripts?
|
||||
We need to find the other ethernet-phy (there should be another 4 somewhere to total 8 LAN ports)
|
||||
|
||||
-> mdio@90000 (4 ports...)
|
||||
|
||||
going to sleep. think and resume tomorrow.
|
||||
|
||||
*/
|
||||